Finally our phone line has been fixed.  We can now add a new post.

Many things to update.

They opened the hole for the stairs between the first and second floors:

2009_11_13 030

They prepared the wood for the stairs between the second and third floors:

2009_11_15 0082009_11_15 009

  They started putting in the pipes for the first floor.  Here is an example of our milchig sink:

2009_11_16 001

 

They finished the wood for the second floor ceiling.  Here are views inside our second floor:

2009_11_13 0072009_11_13 0052009_11_13 0092009_11_13 0062009_11_13 008

They then laid the blocks for the second floor ceiling (we’re having a concrete beams with blocks ceiling) :

2009_11_16 0052009_11_16 0082009_11_16 006

And just for fun, here is the back view from the top of our house:

2009_11_15 005     

2009_11_15 004